Thursday, March 20, 2008
WNER WATERTOWN, NY 1410 VERIFICATION
A QSL letter attached to a e-mail from Chief Engineer Michael Ring verified my report this evening. WNER was also heard during AND1 one evening. WNER was still on daytime power when we picked them up. (They use 3.5 KW day and 58 watts night). Thank you for a most welcomed verification Michael!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment